| Maanshan 1
Herng Chuen, Taiwan
Pressurized Water Reactor
(PWR)
Net Output: 890 MWe
Operable. Initial criticality:
03/1984. Commercial start: 07/1984.
Utility:
Taiwan Power Co.
Reactor Supplier:
Westinghouse Electric Corp.
Steam Generator Supplier:
General Electric Co.
Architecture:
Bechtel Corp.
Construction:
Taiwan Power Co. |
Maanshan 2
Herng Chuen, Taiwan
Pressurized Water Reactor
(PWR)
Net Output: 890 MWe
Operable. Initial criticality:
02/1985. Commercial start: 05/1985.
Utility:
Taiwan Power Co.
Reactor Supplier:
Westinghouse Electric Corp.
Steam Generator Supplier:
General Electric Co.
Architecture:
Bechtel Corp.
Construction:
Taiwan Power Co. |